It's been way too long so I better consult with the elite....Oh well, I guess you guys will have to do. Slowly assembling Shag and I'm at firewall area, rewiring the monster's dash. Have finished running the wires thru the firewall and would like to install booster and MC to finish up the brake system.
I do not want to install the steering column for I think I'll be under the dash for some time so can I wait on it's installation and just do the booster, MC, pedal hangar assy now? I realize the pedal hangar assy does fasten to the dash and wonder if I'll be having to remove it when I install the steering tube. Want to minimize the number of times I remove items.
Finally, I'm installed Shag's original Z bar clutch linkage which Opentracker has rollerized for me beside reinforcing it. Is it critical to install the pivot bracket to the front frame rail now or can I wait?
I do not want to install the steering column for I think I'll be under the dash for some time so can I wait on it's installation and just do the booster, MC, pedal hangar assy now? I realize the pedal hangar assy does fasten to the dash and wonder if I'll be having to remove it when I install the steering tube. Want to minimize the number of times I remove items.
Finally, I'm installed Shag's original Z bar clutch linkage which Opentracker has rollerized for me beside reinforcing it. Is it critical to install the pivot bracket to the front frame rail now or can I wait?