• Hello there guest and Welcome to The #1 Classic Mustang forum!
    To gain full access you must Register. Registration is free and it takes only a few moments to complete.
    Already a member? Login here then!

Any Contractors out there?

FordDude

Well-Known Dude
Staff member
Moderator
Construction Definitions

Contractor: A gambler who never gets to shuffle, cut, or deal.

Bid Opening: A poker game in which the losing hand wins.

Low Bidder: A contractor who is wondering what he left out.

Engineer's Estimate: The cost of construction in Heaven.

Project Manager: The conductor of an orchestra in which every musician is in a different union.

Critical Path Method: A management technique for losing your shirt while being in perfect control.

OSHA: A protective coating made by half-baking a mixture of fine print, red tape, split hairs, and baloney---usually applied at random with a shotgun.

Strike: An effort to increase egg production by strangling the chicken.

Delayed Payment: A tourniquet applied at the pockets.

Completion Date: The point at which liquidated damages begin.

Liquidated Damages: A penalty for failing to achieve the impossible.

Auditor: Person who goes in after the war is lost and bayonets the wounded.

Lawyer: Person who goes in after the Auditor to strip the bodies.

fd
 
Back
Top