Jonk67
Well-Known Member
Ok, I think I'm going to run some temp. side exh. until I can afford the full exh. that I want (FPA headers and cutouts) and I need to just get a quick exh. hung so Tarafied can help me with the first start.
I've got it hung but it's a little far back, want to make sure I've got it snug before I start cutting inches off to get the pipe 1/2 way between the wheel well and rear of front door, at this far rear position I'd be worried about melting tires idleing too long?
Here's where I'm at and I'm debating:
1. Straight out like this
2. Cut the pipe exit at a 45* similar to the turndown on the ground
3. Mount the turndown pointed out so it points a little less straight back like the straight pipe does.
4. do one of the above 3 but oval the pipe as it exits?
Pros/cons, ideas?
Jon
I've got it hung but it's a little far back, want to make sure I've got it snug before I start cutting inches off to get the pipe 1/2 way between the wheel well and rear of front door, at this far rear position I'd be worried about melting tires idleing too long?
Here's where I'm at and I'm debating:
1. Straight out like this
2. Cut the pipe exit at a 45* similar to the turndown on the ground
3. Mount the turndown pointed out so it points a little less straight back like the straight pipe does.
4. do one of the above 3 but oval the pipe as it exits?
Pros/cons, ideas?
Jon