Ok guys, I FINALLY got everything for my 9" rear end, I THINK.
Housing, 28 spline 3rd member, 3.50 posi, my 8" axles to match the 28 spline 3rd member, friction modifier, gear oil, a new gasket etc.
The 3rd member is already set up. I have to pull the 8" from my car, pull the axles out, put them into the 9", and the pig in the housing, put it into my car.
Can anyone walk me through this? Would like to do it this weekend. Just have never done it before, and don't want to make a stupid mistake that will cost me big bucks.
So I'm looking for some step by step instructions on what to do, things to make sure I do and don't do, it. Was told to mark the driveshaft before I remove it? I dunno.
Thanks for the help fellas.
Housing, 28 spline 3rd member, 3.50 posi, my 8" axles to match the 28 spline 3rd member, friction modifier, gear oil, a new gasket etc.
The 3rd member is already set up. I have to pull the 8" from my car, pull the axles out, put them into the 9", and the pig in the housing, put it into my car.
Can anyone walk me through this? Would like to do it this weekend. Just have never done it before, and don't want to make a stupid mistake that will cost me big bucks.
So I'm looking for some step by step instructions on what to do, things to make sure I do and don't do, it. Was told to mark the driveshaft before I remove it? I dunno.
Thanks for the help fellas.