• Hello there guest and Welcome to The #1 Classic Mustang forum!
    To gain full access you must Register. Registration is free and it takes only a few moments to complete.
    Already a member? Login here then!

Winter Projects

Jeremy sent me a picture of his car today with a caption about it being the last drive of the year. Made me wonder what everyone had planned for winter projects while the weather turns bad.

So here it is:

1. What are your winter project goals?
2. What do you plan to have done before new years?
3. What do you plan to have done before spring?
 
Drop Clevo into Shag during this month (ahem Jeff, Mike, Justin, etc.)
Drop T5 behind Clevo
Fire up Clevo during Xmas
Get Shag on the road during Jan.
Get Shag road worthy during Apr.
 
Road trip to Dave's
Haul what's left of the POS coupe back to KY
Make a Trailer out of it before Hot Rod Power Tour!
oh and put my house back together. :sad
 
"cmayna" said:
Drop Clevo into Shag during this month (ahem Jeff, Mike, Justin, etc.)

Name the day, and I'll be there to help you drop that Clevor into place... hopefully soon!

"cmayna" said:
Drop T5 behind Clevo
Fire up Clevo during Xmas
Get Shag on the road during Jan.
Get Shag road worthy during Apr.

Hey, what happens during Feb & March?!
 
Look at car sitting on jack stands.
Look at car sitting on jack stands.
Look at car sitting on jack stands.
Swap rear shoes so they are correct
Go to track
 
"silverblueBP" said:
Look at car sitting on jack stands.
Look at car sitting on jack stands.
Read "How to Pass" written by "A Soccer Mom in a PT".
Swap rear shoes so they are correct
Go to track

Fixed it for ya.............
 
Can you hear it?




It's me rolling on the floor in hysterical laughter :lol :lol
 
"Fast68back" said:
Jeremy sent me a picture of his car today with a caption about it being the last drive of the year. Made me wonder what everyone had planned for winter projects while the weather turns bad.

This pic since I don't have EVERYONE's cell number

26_04_11_09_6_50_59.jpg





"Fast68back" said:
So here it is:

1. What are your winter project goals?
2. What do you plan to have done before new years?
3. What do you plan to have done before spring?

1. Main goal is try to find a decent rat rod project I suppose. That guy has yet to contact me back. I'm guessing that truck is gone...

2. Need to swap out the power steering pump still...

3. Not much else really
 
Nov. Install new steering box that has been sitting on my shelf for 5 months!
Dec. Need a new power steering pump too!
Jan. Freeze my ass off!!
Feb. Freeze my ass off!
Mar. Baby due!!!! No sleep and Diaper time.
Apr. Sell mustang to pay for baby.
 
"garner67" said:
Name the day, and I'll be there to help you drop that Clevor into place... hopefully soon!

Hey, what happens during Feb & March?!

Mike, Feb & March are the more realistic months most of this will happen, especially getting Shag on the road. Must have unrealistic goals or I'll never get it done.

:craz
 
Pull engine...try to contain your laughter
Tear engine down, inspect, re-detail, determine if I need new heads. Try to contain your laughter.
Re-detail engine bay.
Redo brake lines to look purtier.
Clean up some wiring.
Install engine.
See what comes next. Try to contain your laughter.

March time frame. Doing nothing but hunting for the rest of the year.
 
This Friday..

Front and rear brakes ....Rotors,pads,drums,shoes
Front brake lines
Roller perches
 
My goals:
Replace an outside door on the house.
Find a good lawnmower to replace the one that has rusted out.
Nap.
 
Finish roller perches
Finish BOSS 302 crossmember
Find/fix control arms
Paint the suspension (I hope that's a long way off, if I see a paint gun soon, I might have to commit hari-kiri :rofl )

If I get that far, I'm sure I can find other stuff to do. Can't get a whole lot done in the snow though :rofl
 
"blue65coupe" said:
Pull engine...try to contain your laughter
Tear engine down, inspect, re-detail, determine if I need new heads. Try to contain your laughter.
Re-detail engine bay.
Redo brake lines to look purtier.
Clean up some wiring.
Install engine.
See what comes next. Try to contain your laughter.

March time frame. Doing nothing but hunting for the rest of the year.

Your not gonna rebuild the carb?
 
one other project, take these two and make a mini me E-Coupe
72_04_11_09_9_31_05.jpg
 
Last edited by a moderator:
Craig, when is your deadline, I wanna see updates of this project! Thats gonna be cool.

[mod]For an Eleanor, that is[/mod]
 
"Fast68back" said:
Craig, when is your deadline, I wanna see updates of this project! Thats gonna be cool.

For an Eleanor, that is
Probably over the Xmas break. My boss has grounded me from flying anywhere between Xmas and New Year's eve (cost cutting attempt). I'll have a week at home and it will be too cold to do anything else.
 
Back
Top